Although research is needed there are several possible approaches to reduce condensation on the subflooring.
Insulation does moisture barrier go towards floor or away.
The shower will have durock on top of the 2x6 wall.
The inside of the rim joist is sprayed from the sub floor to the bottom of the rim joist to drop the building envelope to the bottom of the joists.
In any case the vapor barrier must point to the warm side.
Whether or not you need a vapor retarder hinges on three main factors.
We do 2 1 2 to 3 inches to create a r 19 rated complete air and moisture barrier under the house.
My walls are insulated with roxul insulation.
A vapor retarder is a material used to prevent water vapor from diffusing into the wall ceiling or floor during the cold winter.
Insulation can actually make the problem worse by keeping the subfloor cool.
If this crawl space has a concrete floor it may or may not have a vapor barrier under the concrete.
One wall of my shower is to an outside wall.
Usually composed of a thin film such as polyethylene vapor barriers are used to retard or prevent water vapor diffusion into a wall ceiling or floor during the cold winter.
Or should i use unfaced.
A layer of concrete on the dirt floor qualifies as a moisture retarder with a perm rating less than one.
To the inside of the home or the outside of the home.
If you install fiberglass batt insulation with a kraft paper vapor retarder in a home which way do you face the vapor retarder.
I don t want a potential mold problem.
Vapor barriers applied over the face of the insulation provide additional benefits in the fight against moisture.
Not every wall does.
Install the thermo cloth and spray the foam to the cloth.
Make sure rain drains away from the house on all sides.
On the durock concrete board i will have tile.
Vapor barriers are sheets of plastic or other material placed on one side of insulation sheets.
Expected effects with dehumidifier.
This barrier is meant to keep moisture from getting to the insulation in the walls and ceilings and it is required by building codes when insulating most houses.
After the insulation is in place you will want to add a vapor retarder sometimes called a vapor barrier if you need one.
Plastic between the studs and durock.
My outside sheathing is osb board.
For many building science questions the answer is it depends for this one the answer is clear.
Moisture tends to condense on subfloors that are cooled by air conditioning in summer.
Can i just remove all doubt and potential moisture and go with unfaced and get a good barrier of insulation.
My thoughts were i would use faced so there would be a barrier for moisture coming from the outside wall.
Expected effects with supply air warmer floors no frozen water lines possibly lower moisture.